This is Hartlepool


Gallery of images 8 - building the nuclear power station


View onto 2nd Pressure Vessel after central area has been concreted
View onto 2nd Pressure Vessel after central area has been concreted
High level work for reinforced concrete structure
High level work for reinforced concrete structure Preparation for high level reinforced concrete structural work at the west elevation of the Reactor Hall
Preparation for high level reinforced concrete structural work at the west elevation of the Reactor Hall Commencing fabrication of the 1st steel liner for the 1st Pressure Vessel
Commencing fabrication of the 1st steel liner for the 1st Pressure Vessel Pressure Vessel construction, supporting light metal ducting
Pressure Vessel construction, supporting light metal ducting Views of 2nd Pressure Vessel concreting operations
Views of 2nd Pressure Vessel concreting operations View onto 2nd Pressure Vessel after all first level has been concreted
View onto 2nd Pressure Vessel after all first level has been concreted View of perimeter wire winding channels
View of perimeter wire winding channels View of reinforced concrete structure around Pressure Vessel
View of reinforced concrete structure around Pressure Vessel Painting the roof steelwork
Painting the roof steelwork
Home | Forum | Hartlepool Tall Ships | Hartlepool News | Accommodation | Entertainment | Things to See & Do | What's On | Restaurants & Bars | Shopping | Tourist Information | History of Hartlepool | Heugh Battery | Ships | Hartlepool Gallery | Building Power Station | Hartlepool Homes | Hartlepool Jobs | Local | Democracy | Education | Hartlepool United | About | Headlander's Blog | Maritime Festival |

© Copyright This is Hartlepool | contact us | advertise | bookmark this page | make your homepage