Building Hartlepool nuclear power station is a collection of over a hundred images taken during the construction of the Reactor Hall Building and the construction of the two pre-stressed concrete Pressure Vessels which contain the reactors and boilers.
The images date from summer 1969 – summer 1972
A completed mini-tower – February 1970
Access to the top of the mini-tower (approx. 85m or 270 ft high)
Completed main towers with slipforming of mini-towers at the top
Placing concrete on the slipform deck for the first mini-tower